06.19.2022 | Project Update
Project Description
1000 Virginia is a 45-story mixed-use tower in the Denny Triangle. It includes 454 residential homes and 1000 square feet of retail at grade.
There will be six (6) levels of below-grade parking and three (3) levels of above-grade parking, which will accommodate 242 vehicles and 397 bicycles. The project site is the existing Cornish College of the Arts Centennial Labs building, located at the corner of Virginia Street and Terry Avenue in Seattle, WA. To be known as The Ayer, the project start date was July 2020, and the tower completion is estimated for November 2023.
Monthly Update for August 2023
- During the Month of August:
- Terry Ave and Virginia St SIP work
- Man lift removal, 8/11-8/25, continuous
- Tower crane removal, 8/11-8/25, continuous
- Multiple deliveries on a daily basis
- Street use impacts:
- 24 hour sidewalk closure on Terry & Virginia Ave.
- Closure of Terry Ave during working hours Monday through Friday.
- Day time closure of Virginia parking lane during work hours.
- Day time closure of Virginia south bound lane during work hours.

Monthly Update for June 2023
- During the Month of June:
- Exterior glass install
- Multiple deliveries on a daily basis
- Street use impacts:
- 24 hour sidewalk closure on Terry & Virginia Ave.
- Closure of Terry Ave during working hours Monday through Friday.
- Day time closure of Virginia parking lane during work hours.
- Day time closure of Virginia south bound lane during work hours.
.jpeg)
Monthly Update for May 2023
- During the Month of May:
- Exterior glass install
- Multiple deliveries on a daily basis
- Structural steel deliveries
- Gas installation in the alleyway
- Alley SIP ongoing
- Street use impacts:
- 24 hour sidewalk closure on Terry & Virginia Ave.
- Closure of Terry Ave during working hours Monday through Friday.
- Day time closure of Virginia parking lane during work hours.
- Day time closure of Virginia south bound lane during work hours.

Monthly Update for April 2023
- During the Month of April:
- Exterior glass install
- Multiple deliveries on a daily basis
- Structural steel deliveries
- Gas installation in the alleyway
- Alley SIP to start end of month
- Street use impacts:
- 24 hour sidewalk closure on Terry & Virginia Ave.
- Closure of Terry Ave during working hours Monday through Friday.
- Day time closure of Virginia parking lane during work hours.
- Day time closure of Virginia south bound lane during work hours.

Monthly Update for March 2023
- During the Month of March 2023:
- Pouring concrete decks twice in the month of March.
- Early Start Work is scheduled for the dates listed below:
- 03/02/2023
- Permit number for next start is 6946978-NV
- SDOT permit # SUCONSTX415391
- Exterior glass install.
- Multiple deliveries on a daily basis.
- Street use impacts:
- 24 hour sidewalk closure on Terry & Virginia Ave.
- Closure of Terry Ave during working hours Monday through Friday.
- Day time closure of Virginia parking lane during work hours.
- Day time closure of Virginia south bound lane during work hours.

Monthly Update for February 2023
- During the Month of February 2023:
- Pouring concrete decks 1 day per week the month of February.
- Early Start Work is scheduled for the dates listed below:
- 2/8/23
- Permit number for next start is 6943336-NV
- SDOT permit # SUCONSTX415391
- Exterior glass install.
- Multiple deliveries on a daily basis.
- Street use impacts:
- 24 hour sidewalk closure on Terry & Virginia Ave.
- Closure of Terry Ave during working hours Monday through Friday.
- Day time closure of Virginia parking lane during work hours.
- Day time closure of Virginia south bound lane during work hours.

Monthly Update for December 2022
- During the Month of December 2022:
- Pouring concrete decks 1 day per week the month of December.
- Early Start Work is scheduled for the dates listed below:
- 11/23/22, 12/8/22, 12/16/22, 12/23/22
- Permit number for next start is 6930763-NV
- SDOT permit # SUCONSTX415391
- Exterior glass install.
- Multiple deliveries on a daily basis.
- Street use impacts:
- 24 hour sidewalk closure on Terry & Virginia Ave.
- Closure of Terry Ave during working hours Monday through Friday.
- Day time closure of Virginia parking lane during work hours.
- Day time closure of Virginia south bound lane during work hours.

Monthly Update for November 2022
- During the Month of November 2022:
- Pouring concrete decks Wednesday’s the month of November.
- Early Start Work is scheduled for the dates listed below:
- 10/26/22, 11/2/22, 11/9/22, 11/16/22, 11/23/22, 12/2/22, 12/9/22, 12/15/22, 12/22/22, 12/30/22, and 1/30/23.
- Permit number for next start is 6925897-NV.
- Exterior glass install.
- Multiple deliveries on a daily basis.
- Street use impacts:
- 24 hour sidewalk closure on Terry & Virginia Ave.
- Closure of Terry Ave during working hours Monday through Friday.
- Day time closure of Virginia parking lane during work hours.
- Day time closure of Virginia south bound lane during work hours.

Monthly Update for October 2022
- During the Month of October 2022:
- Pouring concrete decks every Wednesday the month of October.
- Early Start Work is scheduled for the dates listed below:
- 9/28/22, 10/5/22, 10/12/22, 10/19/22, 10/26/22, 11/2/22, 11/9/22, 11/16/22, 11/23/22, 12/2/22, 12/9/22, 12/15/22, 12/22/22, 12/30/22, and 1/30/23.
- Permit number for next start is 6923363-NV.
- Tower Crane jump scheduled for second weekend of October. More information to follow.
- Exterior glass install.
- Multiple deliveries on a daily basis.
- Street use impacts:
- 24 hour sidewalk closure on Terry & Virginia Ave.
- Closure of Terry Ave during working hours Monday through Friday.
- Day time closure of Virginia parking lane during work hours.
- Day time closure of Virginia south bound lane during work hours.

Monthly Update for September 2022
- During the Month of September 2022:
- Concrete deck pours will alternate between Thursday and Friday the beginning of September, cycling back to Wednesdays on 9/21.
- Exterior glass install.
- Multiple deliveries on a daily basis.
- Street use impacts:
- 24 hour sidewalk closure on Terry & Virginia Ave.
- Closure of Terry Ave during working hours Monday through Friday.
- Day time closure of Virginia parking lane during work hours.
- Day time closure of Virginia south bound lane during work hours.

Monthly Update for August 2022
- During the Month of August 2022:
- Pouring Concrete decks every Wednesday the month of August.
- Exterior glass install.
- Multiple deliveries on a daily basis.
- SCL will be performing work in south end of the alley.
- Street use impacts:
- 24 hour sidewalk closure on Terry & Virginia Ave.
- Closure of Terry Ave during working hours Monday through Friday.
- Day time closure of Virginia parking lane during work hours.
- Day time closure of Virginia south bound lane during work hours.

Project Update - June 2022
- Pouring concrete decks every Wednesday throughout the month of June 2022.
- Exterior glass installation.
- Multiple deliveries on a daily basis.
- Installing side sewers in Terry Avenue Saturdays and Sundays 6/04/2022 - 6/19/2022; Street will be closed 7 am-6 pm and open at night.
Street Use Impacts
- 24-hour sidewalk closure on Terry and Virginia Avenue.
- Closure of Terry Avenue during working hours Monday through Friday.
- Daytime closure of Virginia parking lane during work hours.
- Daytime closures of Virginia Southbound lane during work hours.
- Closure of Terry Avenue 7 am-6 pm on Saturdays and Sundays 6/4/2022-6/19/2022.
- Additional street impacts will be sent via email to neighboring buildings. Please email kfulton@hollandpartnergroup.com with any questions or concerns.

Schedule Information
- Utility Work on Virginia, Terry, and in the alley: June 2020 - July 2020
- Shoring & Excavation: August 2020 - December 2020
- Concrete Structure: December 2020 - March 2023
- Interior Finishes: July 2022 - September 2023
- Building Opening: September 2023
- Project Completion: November 2023
Work Hours
The City of Seattle approved construction hours are as follows:
- Monday – Friday from 7:00 am to 7:00 pm (excluding holidays)
- Monday – Friday from 8:00 am to 4:00 pm (excluding holidays) for construction activities that are louder than 90 decibels.
- Saturdays from 9:00 am to 5:00 pm
- No work on Sundays
- It is Holland Construction’s corporate policy to not work on Saturday or Sunday. There will be limited times as required by the City of Bellevue where work will need to occur on a Saturday to accommodate construction traffic such as oversized loads. If Saturday work is required, it will occur between 9:00 am and 5:00 pm.
- Typically, work will not take place on Sundays or on any of the following holidays: New Year’s Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and the day after, and Christmas Day.
- If it is required that work be performed at night, outside of standard working hours, on a Sunday or Holiday, then it will be coordinated in advance with City approval and community notification.